Bridge Load Testing

Well done to all the technology club at the bridge load testing today - the winning lollipop stick bridge, designed and built by AJ Engineers, carrying nearly 10kg!

Each team designed their own truss bridge using lollipop sticks - the aim being to build the lightest bridge to carry the most weight, so the final bridge score was calculated using the maximum load carried divided by the weight of the bridge, the best carrying 83 times its own weight!

Technology After School Club